March 24, 2006 - 16:48 AMT
BTC Regular Sector Being Filled with Oil
BTC Co started the filling of the regular sector of the Baku-Tbilisi-Ceyhan oil pipeline with Azeri Light oil. Last week the filling of the sector between PST-2 and PST-3 started. "The shipping of the first tanker with Azeri oil from the port of Ceyhan is scheduled for this spring," BP said, reported Trend. To note, 5.5 million barrels of oil has been pumped by March 1, 2006. 10 million barrels are essential for the complete filling of the oil pipeline.